Friendly Area Neighbors
  • Get Involved
    • Annual FAN Summer Picnic
    • College Hill Reservoir Watch
    • Equity Action Team >
      • Kalapuya Cultural Project and Wetlands Preservation
      • Dr. Edwin Coleman, Jr., Center Mural Project
    • Friendly Park
    • Outreach Team
    • Ready Friendly
    • Rodent Control
    • Sustainability Team >
      • Plastics Recycling Update
      • Local Food Resources
      • Westmoreland Park Wetlands Enhancement Project
    • Transportation Team
    • Common Ground Garden
    • Friendly Fruit Tree Project
    • Housing & Homelessness Committee
    • Madison Meadow
    • ToolBox Project
    • Woodfield Microhood
  • About
    • Board
    • Email Lists
    • Meetings
    • Newsletter
    • Resources
  • Calendar
  • Contact
  • Blog

Construction Starts on South Willamette Street

5/12/2019

 
Willamette Street will be getting much needed improvements this year, both below and above ground.

Water Main and Services

The Eugene Water and Electric Board (EWEB) has started work to replace the water main and services from 23rd Avenue to 28th Avenue along Willamette Street.

Work is scheduled to continue through the end of June between the hours of 7:00 AM and 5:00 PM Monday-Thursday.

Construction activity may cause temporary traffic impacts, flaggers, and lane changes, along with temporary delays and noise. EWEB will provide advanced notification prior to water service interruptions.

This project is part of EWEB's strategy to improve our water system and increase water reliability.

For more information, contact EWEB's Water Division at 541-685-7595, WaterEngineeringTechnicians@eweb.org, or website.

South Willamette Street Enhancement

After the completion of EWEB's portion of the project, the City of Eugene Public Works will start its work in the fall of 2019.

The project will reconstruct Willamette Street and its sidewalks, driveway aprons, street lights, pedestrian signals, and storm drainage system from 24th Avenue to 29th Avenue. The project will also resurface the pavement from 23rd Avenue to 24th Avenue. Except for 23rd to 24th Avenues, all the new pavement will be Portland Cement Concrete.

Rain gardens (curbed stormwater treatment planters) will be added to some side streets near where they intersect with Willamette Street. Sidewalks will be widened to 9 feet. All sidewalk ramps will be constructed to ADA guidelines.

Some driveways may be consolidated. All driveway aprons will be reconstructed. The power utility will not be undergrounded.

The bicycle lanes and center lane will remain.
Traffic Impacts
  • Drivers should expect lane closures and detours during construction.
  • During signal replacement at 27th Avenue and Willamette Street, 27th Avenue (but not Willamette Street) will have stop signs. Pedestrians will have a push button rapid flashing beacon to assist crossings.
  • Pedestrians should expect sidewalk closures and detours.
  • Bicyclists should expect to merge with motor vehicle traffic and be subject to detours.
  • All commuters should expect equipment and workers in the roadway leading to congestion and delays during the work.

Project Funding
Funding sources are from a federal STP-U grant, the Pavement Bond Measure passed by voters in 2012, and stormwater user fees.

For More Information
Project Manager: Patrick Cox, phone 541-682-5331, Patrick.m.cox@ci.eugene.or.us
Online road reports: www.eugene-or.gov/traffic
On Twitter: twitter.com/EugenePW

Sign Up to Participate

​The FAN Transportation Team will coordinate and publicize the progress of this project through the Friendly Newsletter, Friendly Flyer, Google Group, and Facebook and Twitter feeds. Sign up or follow us to participate and stay informed.

FAN Transportation Team Meetings
First Monday of the month, except January and September.
7:00 - 9:00 PM
Billy Mac's Bar & Grill
605 W 19th Ave
Eugene, OR 97402
Map and Directions
The Transportation team meetings are open to the public.

Comments are closed.

    Author

    Friendly Area Neighbors

    Archives

    June 2021
    February 2021
    March 2020
    January 2020
    December 2019
    September 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019

    Categories

    All
    Art
    Entertainment
    Environment
    Events
    History
    Parks
    Schools
    Sports
    Structures
    Transportation

    RSS Feed

Friendly Area Neighbors

Contact
​Newsletter
  • Get Involved
    • Annual FAN Summer Picnic
    • College Hill Reservoir Watch
    • Equity Action Team >
      • Kalapuya Cultural Project and Wetlands Preservation
      • Dr. Edwin Coleman, Jr., Center Mural Project
    • Friendly Park
    • Outreach Team
    • Ready Friendly
    • Rodent Control
    • Sustainability Team >
      • Plastics Recycling Update
      • Local Food Resources
      • Westmoreland Park Wetlands Enhancement Project
    • Transportation Team
    • Common Ground Garden
    • Friendly Fruit Tree Project
    • Housing & Homelessness Committee
    • Madison Meadow
    • ToolBox Project
    • Woodfield Microhood
  • About
    • Board
    • Email Lists
    • Meetings
    • Newsletter
    • Resources
  • Calendar
  • Contact
  • Blog